Transition joints due to the body can be applied to a variety of industrial enterprises to meet the needs of the use of the body, so it is also considered to be a more common joints, and as an important part of the transition, in the installation must not be sloppy, otherwise it is easy to cause leakage, some special industries and even prone to safety accidents, so we should be clear about transition joints body in the installation of what are the steps, the following is a transition by me to introduce a specific Joint body installation steps:
I. Pre-installation inspection
In the transition joint body should be installed before all the parts to check to see whether the parts shortage and whether the parts are damaged, whether there is a wrong connection phenomenon.
Second, parts splicing
All the parts that can be assembled into one should be assembled and spliced to lay a good foundation for the final assembly, and the process should try to ensure that the connection is compact to avoid leakage.
Third, bolt fixing
All the assembled parts of the whole with bolts and nuts for fixing, to ensure that the degree of solidity of the fixed, but not too tight, easy to damage the parts.
Fourth, adjust the position
Install the final assembled transition joint and adjust the final position to ensure that it can work properly.
Fifth, test performance
Finally, to test the performance of the transition joint body, work test to detect whether there will be leakage and whether the installation is loose, to ensure that it will not appear security problems.
Through the above introduction I believe we have a final knowledge of the transition joint body installation steps, transition joints as an important transition point of machinery, its significance can be imagined, so in the installation of its focus on observation, the steps are a step can not be wrong, to avoid the emergence of serious safety issues.